• Aluminium Milling Lathe CNC Machining Part Lighting Hardware Accessories
  • Aluminium Milling Lathe CNC Machining Part Lighting Hardware Accessories
  • Aluminium Milling Lathe CNC Machining Part Lighting Hardware Accessories
  • Aluminium Milling Lathe CNC Machining Part Lighting Hardware Accessories
  • Aluminium Milling Lathe CNC Machining Part Lighting Hardware Accessories
  • Aluminium Milling Lathe CNC Machining Part Lighting Hardware Accessories

Aluminium Milling Lathe CNC Machining Part Lighting Hardware Accessories

Application: Fastener, Auto and Motorcycle Accessory, Hardware Tool, Machinery Accessory
Standard: GB, EN, API650, China GB Code, JIS Code, TEMA, ASME
Surface Treatment: Polishing
Production Type: Mass Production
Machining Method: CNC Machining
Material: Nylon, Steel, Plastic, Brass, Alloy, Copper, Aluminum, Iron
Samples:
US$ 5/Piece 1 Piece(Min.Order)
| Request Sample
Diamond Member Since 2017

Suppliers with verified business licenses

Rating: 5.0/5
Trading Company
  • Overview
  • Product Description
  • Company Profile
  • Certifications
  • Exhibition
  • Packaging & Shipping
  • FAQ
Overview

Basic Info.

Model NO.
JHX04
Equipment
3/4/5 Axis Center Machining
Drawing Format
2D/(Pdf/CAD)3D(Iges/Step/STP)etc
Finish
Anodized, Polished, Brushed, Plating etc.
MOQ
1 PCS
Monthly Capacity
100000PCS
Process
CNC Turning, Milling, CNC Machining, Lathe
Service
Turning Milling Drilling Grinding
Micro Machining or Not
Micro Machining
Materials
Aluminium/Brass/Stainless Steel/Carbon Steel/ABS
Delivery Time
7-15 Days
Transport Package
Carton or Customized
Specification
Customized
Trademark
OEM
Origin
Shenzhen
Production Capacity
10000 Piece/Month

Product Description

Aluminium Milling Lathe CNC Machining Part Lighting Hardware Accessories

High Quality CNC OEM Machining Supplier
Service
CNC Turning, CNC Milling, Laser Cutting, Bending, Spinning, Wire Cutting, Stamping,
Electric Discharge Machining (EDM), Injection Molding
Materials
1). Aluminum: AL 6061-T6, 6063, 7075-T etc
2). Stainless steel: 303,304,316L, 17-4(SUS630) etc
3). Steel: 45#,Q235, Q345B
4). Titanium: TA1,TA2/GR2,TA4/GR5
5). Brass: C36000 (HPb62)
6). Copper, bronze, POM,Acrylic, PC, etc.
Surface Treatment
Sandblasting,Anodize color,Zinc/Nickl Plating,Polish
Processing Technology
CNC machining parts,turning/milling process
MOQ
1pcs
Lead Time
Sample: 3-5 days.
Mass Production: within 10-25 days after receiving the deposit.
Package
1)pp bags + carton or wooden case
2) according to customers' requirements
3)negotiable
Payment Terms
Trade Assurance, T/T/  West Union

Product Description

 

Aluminium Milling Lathe CNC Machining Part Lighting Hardware AccessoriesAluminium Milling Lathe CNC Machining Part Lighting Hardware AccessoriesAluminium Milling Lathe CNC Machining Part Lighting Hardware Accessories

Company Profile

Aluminium Milling Lathe CNC Machining Part Lighting Hardware Accessories

Aluminium Milling Lathe CNC Machining Part Lighting Hardware Accessories

Certifications

Aluminium Milling Lathe CNC Machining Part Lighting Hardware Accessories

Exhibition

 

Aluminium Milling Lathe CNC Machining Part Lighting Hardware Accessories

Packaging & Shipping

 

Aluminium Milling Lathe CNC Machining Part Lighting Hardware AccessoriesAluminium Milling Lathe CNC Machining Part Lighting Hardware Accessories

 

FAQ

1.Are you a manufacturer or a trading company?

We are a 12600-square-meter factory located in Shenzhen, China.

2.How can I get a quote?
Detailed drawings (PDF/STEP/IGS/DWG...) with material, quantity and surface treatment information.

3. Can I get a quote without drawings?
Sure, we appreciate to receive your samples, pictures or drafts with detailed dimensions for accurate quotation.

4.Will my drawings be divulged if you benefit?
No, we pay much attention to protect our customers' privacy of drawings, signing NDA is also accepted if need.

5. Can you provide samples before mass production?
Sure, sample fee is needed, will be returned when mass production if possible.
 
6. How about the lead time?
Generally, 1-2 weeks for samples, 3-4 weeks for mass production.

7. How do you control the quality?
(1) Material inspection--Check the material surface and roughly dimension.
(2) Production first inspection--To ensure the critical dimension in mass production.
(3) Sampling inspection--Check the quality before sending to the warehouse.
(4) Pre-shipment inspection--100% inspected by QC before shipment.

8. What will you do if we receive poor quality parts?
Please kindly send us the pictures, our engineers will find the solutions and remake them for you asap.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2017

Suppliers with verified business licenses

Rating: 5.0/5
Trading Company
Number of Employees
58
Year of Establishment
2016-09-09